The project
Bathroom refurbishment completed for our client in time for Christmas. Upon stripping the old wall tiles, the render beneath had perished and had to be removed. We dry lined these walls and re-plastered the ceiling before laying new wall and floor tiles.
The existing chinaware was salvaged and re-used and the shower parts were replaced with new. A new chrome towel rail in place of the old radiator, new cupboards and a custom made bath panel completed the job.